Creating a new management system is a complex and long process, containing the design stages of the automated control systems, manufacturing and assembly of its constituent elements, construction, installation and commissioning of the system.
Design of automatic control systems is the process of creating a set of technical documentation, models and prototypes, necessary and sufficient for the manufacture, installation, commissioning and operation of the automated control systems.
The main problem solved in the process of development of automated control systems includes:
The process of design consists of several stages.
1. Technical task.
At this stage we have the development, design, coordination and approval of the Terms of Reference for creation (modernization) I&C system and, if necessary, technical specifications for the adjacent part of the I&C system.
2. Preliminary design.
At the stage of "Preliminary design" is made:
3. Technical project
The scope of work at the stage of the "Technical project":
4. Detailed design (working documentation).
At this stage it is carried out:
We are ready to perform the full range of design automation systems and integrated automation, taking into account the requirements of the customer, to a good quality and on time.